Measure the area
Enter length and width, or switch to an area you already know. For an irregular space, sketch non-overlapping rectangles. Measure each in feet, calculate its volume separately, then add the cubic yards.
SOIL & LANDSCAPE TOOL 01
Enter length, width and depth to estimate how many cubic yards of dirt you need. Add supplier density for US tons, bag size for bags, or a price for material cost.
01 / YOUR MEASUREMENTS
02 / YOUR ESTIMATE
READY WHEN YOU AREEnter your dimensions to see cubic yards,
then add buying details if you need them.
Dirt volume
in one cubic yard
covered by 1 yd³ at 3 inches
in one US short ton
FROM MEASUREMENT TO MATERIAL
Enter length and width, or switch to an area you already know. For an irregular space, sketch non-overlapping rectangles. Measure each in feet, calculate its volume separately, then add the cubic yards.
Measure the thickness of new dirt needed at evenly spaced points across the area—not the depth of existing soil. For a roughly even layer, use the average of those measurements in inches. If sections need substantially different depths, calculate each section separately and add the volumes.
Use cubic yards for a bulk order, or add the volume printed on a bag. If you add an allowance, it stays separate from the measured volume.
THE WORKING, NOT JUST THE ANSWER
When ordering dirt, a “yard” usually means a cubic yard of volume: a space 3 ft long × 3 ft wide × 3 ft deep, equal to 27 cubic feet. Square yards measure area; cubic yards include depth. For the formula below, use length and width in feet and depth in inches.
(length × width × depth) ÷ 324324 = 12 inches per foot × 27 cubic feet per cubic yardAlready know the square footage? Cubic yards = area (ft²) × depth (in) ÷ 324. Choose “I know the area” above. If your area is in square yards, multiply it by 9 first to get square feet.
For example: an 18 ft × 12 ft space at 6 inches deep needs 4 yd³ (108 ft³). Adding 10% gives 4.4 yd³. In 2 ft³ bags, that is 60 whole bags after rounding up.
| Depth | Coverage |
|---|---|
| 1 inch | 324 ft² |
| 2 inches | 162 ft² |
| 3 inches | 108 ft² |
| 4 inches | 81 ft² |
| 6 inches | 54 ft² |
| 12 inches | 27 ft² |
Coverage (ft²) = cubic yards × 324 ÷ depth (in). For example, 5 yd³ at 3 inches covers 540 ft². Geometric coverage only; these depths are examples, not recommended construction specifications.
A FEW DETAILS THAT MATTER
Moisture, soil composition and compaction affect bulk density. That is why this calculator does not fill in a universal dirt density. Ask your supplier for a value that matches the material you are buying.
Adding 15% means multiplying by 1.15. Replacing a 15% loss in volume would mean dividing by 0.85. Those are different calculations. This tool provides an extra allowance, not a compaction design.
Whole bags are rounded up only after calculating the required volume. Bulk orders use the calculated volume; your supplier may have a minimum quantity or order increment.
FIELD NOTES
Measure length, width and average depth. In US units, multiply length (ft) × width (ft) × depth (in) and divide by 324 to get cubic yards. The calculator can also use an area you already know.
Multiply your area in square feet by the depth in inches, then divide by 324. For example, 500 ft² at 3 inches deep needs 500 × 3 ÷ 324 = about 4.63 cubic yards of dirt, before any extra allowance. Choose “I know the area” in the calculator to enter square footage directly.
Split the space into non-overlapping rectangles and calculate length (ft) × width (ft) × depth (in) ÷ 324 for each. A 10 × 10 ft section at 3 inches needs about 0.926 yd³; a 10 × 5 ft section at 6 inches also needs about 0.926 yd³. Together they need about 1.85 yd³ before allowance. Keep the unrounded values until you add the sections. Do not average different depths without accounting for the area each covers.
There is no single conversion for every soil. US short tons = cubic yards × 27 × bulk density in lb/ft³ ÷ 2,000. Enter the density of your supplied material in Buying options. A US short ton is 2,000 lb; a metric tonne is 1,000 kg.
It depends on the material’s bulk density. For one US short ton (2,000 lb), cubic yards = 2,000 ÷ (27 × density in lb/ft³). If your supplier specifies 100 lb/ft³, one US ton is about 0.74 cubic yards. This density is an example, not a default; moisture and compaction change the conversion.
You can calculate the geometric volume of a topsoil layer or bed with the same area-and-depth formula. Choosing the soil blend, drainage or suitable depth is a separate decision. Check any bag volume or density against that specific product.
Yes. Add your supplier’s material price per cubic yard, cubic meter, US short ton or bag. Pricing by weight requires density; pricing by bag requires bag volume. The result excludes delivery, tax, labor and supplier minimums.
Yes. Choose Metric to enter length and width in meters, area in square meters, and depth in centimeters. Existing dimensions are converted when you switch units. Results include both cubic meters and cubic yards.
Your inputs and up to 10 recent calculations are stored only in this browser. No account is needed. Use Recent to reopen or delete records. Clearing site data removes them. Browser storage is not a backup, and the calculator does not promise offline availability.
CHECK THE WORK
We use geometric formulas and published unit definitions. Material assumptions remain visible and editable.
Soil, compost and mulch volume, and converting volume to bag counts.
Length, volume, mass and the definition of a US short ton.
Why soil structure and compaction affect density. Dry soil density is not a default for wet delivered material.